Orbita shopping center with rooftop parking
Orbita Group · Tyumen · 2023 · Sports and retail

- Area
- 12 800 m²
- Timeline
- 9 months
- Steel
- 1 610 t
- Span
- 24 m
- Height
- 9 m
Task
A two-story shopping center with parking for 300 cars on the roof: high loads, glazing around the entire perimeter and tenants moving in one after another.
Solution
- 01A composite steel-concrete floor on profiled sheeting, beams with web openings for utilities
- 02A steel ramp to the roof with an anti-icing coating
- 03Erection in sections: the anchor tenant opened before the others
Result
- The anchor supermarket opened 2 months earlier
- Rooftop parking — 300 extra spaces without buying land