Buildings we have delivered
Each case shows the original task, the engineering solution and the result in numbers: timeline, steel, the client’s money.
8 projects · 72 080 m² · 6 660 t of steel
LogisticsYekaterinburg · 2025 · Uralsky Terminal
A class A logistics center of 24 000 m²
- area
- 24 000 m²
- area
- timeline
- 7 mo.
- timeline
- of steel
- 1 380 t
- of steel
AgricultureKurgan · 2025 · Niva agricultural holding
A grain store for 30 000 t with retaining walls
- area
- 6 480 m²
- area
- timeline
- 4 mo.
- timeline
- of steel
- 540 t
- of steel
ManufacturingPerm · 2025 · Aviaremont-Ural
A helicopter maintenance hangar
- area
- 2 880 m²
- area
- timeline
- 5 mo.
- timeline
- of steel
- 410 t
- of steel
SportsKazan · 2025 · Volna sports school
An indoor football arena with running tracks
- area
- 7 560 m²
- area
- timeline
- 8 mo.
- timeline
- of steel
- 690 t
- of steel
ManufacturingMagnitogorsk · 2024 · Metallist plant
A metalworking shop with 20 t cranes
- area
- 8 640 m²
- area
- timeline
- 6 mo.
- timeline
- of steel
- 920 t
- of steel
SportsMiass · 2024 · Miass City Administration
An ice arena for 1 200 spectators
- area
- 5 400 m²
- area
- timeline
- 10 mo.
- timeline
- of steel
- 780 t
- of steel
RetailTyumen · 2023 · Orbita Group
Orbita shopping center with rooftop parking
- area
- 12 800 m²
- area
- timeline
- 9 mo.
- timeline
- of steel
- 1 610 t
- of steel
AgricultureNalchik · 2023 · Sady Predgorya
A controlled-atmosphere fruit store
- area
- 4 320 m²
- area
- timeline
- 5 mo.
- timeline
- of steel
- 330 t
- of steel