a fictional plant
RU
OPORAsteel structures

An indoor football arena with running tracks

Volna sports school · Kazan · 2025 · Sports and retail

An indoor football arena with running tracks — the building after handover
After handover, 2025
126 m60 m15 m
Frame: 60 m span × 126 m, height 15 m
Area
7 560 m²
Timeline
8 months
Steel
690 t
Span
60 m
Height
15 m

Task

An indoor arena with a 60 × 40 m pitch and an athletics track: a 60 m column-free span and natural lighting.

Solution

  1. 0160 m arched trusses, assembled on the ground and lifted by two cranes
  2. 02Polycarbonate skylights along the entire length
  3. 03200 mm insulation for year-round training

Result

  • Training all year round
  • Electricity for lighting — 35% less thanks to the skylights
Calculate a similar building