A metalworking shop with 20 t cranes
Metallist plant · Magnitogorsk · 2024 · Production workshops

- Area
- 8 640 m²
- Timeline
- 6 months
- Steel
- 920 t
- Span
- 30 m
- Height
- 14 m
Task
A new shop for a sheet cutting line: two 20 t overhead cranes, heavy foundations for machine tools and a tight tolerance on crane runway deformation.
Solution
- 01Stepped columns with crane brackets, fatigue analysis
- 02Laser survey of the crane runways after erection, tolerance ±3 mm
- 03R45 fire protection with thin-film paint applied at the plant — no scaffolding on site
Result
- Cranes put into operation 5 days after erection
- The shop reached its design capacity in 2 months
- A repeat order — a finished goods warehouse