a fictional plant
RU
OPORAsteel structures

A metalworking shop with 20 t cranes

Metallist plant · Magnitogorsk · 2024 · Production workshops

A metalworking shop with 20 t cranes — the building after handover
After handover, 2024
144 m2 × 30 m14 m
Frame: 2 spans of 30 m × 144 m, height 14 m
Area
8 640 m²
Timeline
6 months
Steel
920 t
Span
30 m
Height
14 m

Task

A new shop for a sheet cutting line: two 20 t overhead cranes, heavy foundations for machine tools and a tight tolerance on crane runway deformation.

Solution

  1. 01Stepped columns with crane brackets, fatigue analysis
  2. 02Laser survey of the crane runways after erection, tolerance ±3 mm
  3. 03R45 fire protection with thin-film paint applied at the plant — no scaffolding on site

Result

  • Cranes put into operation 5 days after erection
  • The shop reached its design capacity in 2 months
  • A repeat order — a finished goods warehouse
Calculate a similar building